The home was completely Remodeled and almost doubled in size. A new roof, siding, windows, deck, handicap ramp, central air & heating were provided while the inside was gutted with a designed bedroom and special shower added for the veteran. The project was started on Memorial Day 2011 and completed November 5th of the same year. Everything from the materials to the labor were donated.
0 Comment